The Cameroonian army must put its conscience to the test
Who really pushed for the return of the Vice President of the Republic?
When politics fails a nation, football and the Church become the battleground
Biya has had his era; Cameroon must now be allowed to enter its next one
Biya’s hand: a source of glory and shame
4 Anglophone detainees killed in Yaounde
Chantal Biya says she will return to Cameroon if General Ivo Yenwo, Martin Belinga Eboutou and Ferdinand Ngoh Ngoh are sacked
The Anglophone Problem – When Facts don’t Lie
Anglophone Nationalism: Barrister Eyambe says “hidden plans are at work”
Largest wave of arrest by BIR in Bamenda
14, June 2016
Kribi port to go operational before 2017 0
We understand that the first phase has cost roughly 245 billion FCFA and it will generate 2,000 direct jobs and 2000 indirect jobs. All installations and structures including storage areas, service buildings, signaling beacons all meet the standards set by the International Association of Lighthouse Authorities (IALA). The multipurpose terminal has a capacity of 1.2 million tonnes of goods per year and a container terminal quay with a length of 350 meters and a 14 hectare storage area.
CIR